EZ Blockout installs directly to the pipe in about one minute, stays secure during the concrete pour, and creates a clean, controlled opening for final pipe installation. RFID locating helps crews accurately find the blockout after the pour.
~1 minute
Installation
~4.5 minutes
Removal
3 sizes
2″, 3″, and 4″
A Better Way to Handle Plumbing Blockouts
- Traditional Blockout Methods
- Loose foam can leave debris across the jobsite
- Blockouts may shift or float during the concrete pour
- Locating the pipe can result in unnecessary chip-outs
- Sonotube requires additional preparation and packing
- The EZ Blockout Advantage
- Installs directly to the pipe in approximately one minute
- Remains secured in position during the concrete pour
- Standard RFID locating helps crews accurately find the pipe
- Creates a cleaner, controlled removal area
- Reduces preparation time and jobsite waste